Mitsubishi Electric MSZ-RW25VG Service Manual page 52

Indoor unit
Hide thumbs Also See for MSZ-RW25VG:
Table of Contents

Advertisement

OPERATING PROCEDURE
6. Removing the horizontal vanes (R)(L) and the
horizontal vane motors (R)(L) (Photos 8, 12, 13, 14)
(1) Remove the front panel, horizontal vanes (upper R/L),
(lower R/L), the corner boxes (R) (L), the panels (U)
(R) (L), V.A. clamp, the electrical cover, Wi-Fi assem-
bly, the panel (F), and DISPLAY and i-see SENSOR
ASSEMBLY.
(2) Remove the following connector (Photo 8):
<Indoor electronic control P.C. board>
CN151 (Vane motors)
(3) Pull out the drain hose from the nozzle assembly.
(4) Pull and remove the nozzle assembly (4 catches)
(Photo 12).
(5) Cut off the cable tie to secure the lead wires on the
right side of the nozzle assembly (Photo 13).
Removing horizontal vane motors (R) (Photo 13)
(6) Loosen the lead wires, and disconnect the connector
of the horizontal vane motors (R).
(7) Remove the 2 screws of the horizontal vane motors (R).
(8) Remove the horizontal vane motors (R).
Removing horizontal vane motors (L) (Photo 14)
(9) Loosen the lead wires, and disconnect the connector
of the horizontal vane motors (L).
(10) Remove the 2 screws of the horizontal vane motors
(L).
(11) Remove the horizontal vane motors (L).
OBH902A
PHOTOS/FIGURES
Photo 12
Photo 14
Catches of nozzle assembly (4 places)
Photo 13
Cable tie
Screws of the horizontal vane motor (R)
Photo 14
Horizontal vane motor (L)
Screws of the horizontal vane motor (L)
52
Photo 13
Horizontal vane motor (R)
Screws of the horizontal vane motor (R)
Screws of the horizontal vane motor (L)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msz-rw35vgMsz-rw50vg-e

Table of Contents