Fibre Feeder Calibration - PROALL G Series Operator's Manual

Table of Contents

Advertisement

MX05001
NOTE: After the control gate has been reset, the
conveyor must be run until the adjusted material
flow is past the discharge point. Disregard the
material released during this operation and re-
zero the meter.
After calibrating using weight it is recommended
that the yield of each mix be verified by batching
concrete into a yield box (container of known
volume) and comparing the results with that
displayed by the meter. Small adjustments in the
gate setting may be necessary to produce the
desired yield. A yield correction factor can be
entered into the computer that will adjust the
gate heights accordingly in the mix entry screen
(see Control System manual) or the adjusted
heights can be entered and saved manually.

Fibre Feeder Calibration

NOTE: There is a flow rate chart inside the front
cover of the fibre feeder for reference
1. Determine the amount of fibre required in
kg/lb per minute according to the mix design
(refer to the Calibration Sheets)
2. Set the fibre feeder air pressure with the air
pressure control valve (refer to Fibre feeder
control valve. on page 4-6) and the fibre
feeder flow rate chart located on the valve
bracket.
3. Press button Error! Reference source not
found. - Error! Reference source not found.
- on the Operating Keypad (refer to page 4-
3) to prime, collect and weigh the fibre.
Compare the amount discharged with the
amount required and make adjustments
using the air pressure control valve as in step
2 above.
4. Place the fibre feeder in the Automatic
position to dispense fibre when the
conveyor belt is running by pressing button
Error! Reference source not found. on the
Operating Keypad.