Pressurisation (En Option) / Pressurization (Optional) - Nexans ABS1335 Installation And Manual

Table of Contents

Advertisement

2. Mettre en place les 5 autres vis (1) et
serrer à l'aide d'un tournevis Pozidriv n°2.
Install the 5 remaining screws (1)
and tighten with a Pozidriv n°2
screwdriver.

10. PRESSURISATION (EN OPTION) / PRESSURIZATION (OPTIONAL)

1. Dévisser le capuchon de la valve de pressurisation.
Unscrew the plug of the pressurization valve.
2. Pressuriser le boîtier à 400 mbar pendant 15 mn afin de détecter une fuite éventuelle.
Proceed to the pressurization of the unit (suggested pressure 5.8 PSI) during 15mn, to
detect a possible loss.
3. Revisser le capuchon sur la valve.
Screw the plug back on the valve.
20206803
25, avenue Jean Jaurès - BP 11 - 08330 - Vrigne-aux-Bois - FRANCE
Téléphone :+33 (0) 3.24.52.61.61
NEXANS INTERFACE
Fax : +33 (0) 3.24.52.61.66
BLACKBOX
ABS1335
35/36

Advertisement

Table of Contents
loading

This manual is also suitable for:

20206803

Table of Contents