Table of Contents

Advertisement

Installation
3. Lift the inner box from the large box by pulling up on the lifting band.
NOTE: Do not cut the lifting band.
4. Slide the lifting band from the inner box.
Slide lifting band
off (do not cut)
5. Remove the packing material inside the inner box, which includes the
temperature logger that is used to ensure that the Detector maintained the
proper temperature will being shipped and stored.
Lift out inner box
by pulling
on lifting band
(do not cut the band)
GS20_416.cdr
Temperature
logger
Open box, remove packing insert,
temperature logger, and phase
change material.
Lift out Detector and carefully
remove from wrapper.