4. Position the controller so the front faces the front of the rack, and then slide the controller gently onto the rails.
Stop sliding when the mounting flanges on the front of the controller touch the vertical face of the rack.
NoteCheck the rear of the controller chassis to be sure the chassis is fit securely into the stoppers.
Number
1
5. On the front of the controller chassis, attach the two bind screws and washers to each side of the rack.
Number
1
Step 3: Connect the storage system to power
https://knowledge.hitachivantara.com/Documents/Storage/VSP_E_Series/93-04-0x/Installation/Installing_your_VSP_E590_an...
Item
Clip
Washer and bind screw
Item
Stopper
Item
Bind screws
Updated: Thu, 06 Jan 2022 00:49:25 GMT
Powered by
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsp e790

Table of Contents

Save PDF