Overview of the installation and commissioning process
Steps
1
Fit the connection adaptor on the thermostatic valve.
2
Open the ViCare thermostatic radiator valve.
3
Insert the batteries.
4
Pair the ViCare thermostatic radiator valve.
5
Fit and set up the ViCare thermostatic radiator valve
on the connection adaptor.
Fitting the connection adaptor
Note
The valve must be wide open before the old radiator
actuator is removed. To do this, turn the actuator to the
highest level.

Installation sequence

Page
With gateway
9
11
11
14
12
Without gateway
9
11
11
12
9