Related
Documentation
Verifying the M320 Router Parts Received
Copyright © 2010, Juniper Networks, Inc.
All manuals and user guides at all-guides.com
Figure 25: Contents of the T1600 Shipping Crate
Verifying the M320 Router Parts Received on page 51
Installing the M320 Router Using a Mechanical Lift on page 63
Installing the M320 Chassis in the Rack Manually on page 79
A packing list is included in each shipment. Check the parts in the shipment against the
items on the packing list. The packing list specifies the part numbers and descriptions of
each part in your order.
If any part is missing, contact a customer service representative.
A fully configured router contains the router chassis with installed components, listed in
Table 16 on page 51, and an accessory box, which contains the parts listed in Table 17
on page 52. The parts shipped with your router can vary.
Table 16: M320 Router Parts List for a Fully Configured Router
Component
Cable cover
Cable guards
Chassis, including midplane, craft interface, and
rack-mounting brackets
Chapter 4: Unpacking the M320 Router
Quantity
1
2 upper, 2 lower
1
51