Function Tests

Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation inspection.
3 Always perform the function tests prior
to use.
Know and understand the function tests
before going on to the next section.
4 Inspect the workplace.
5 Only use the machine as it was intended.
14
Fundamentals
The Function Tests are designed to discover any
malfunctions before the machine is put into service.
The operator must follow the step-by-step
instructions to test all machine functions.
A malfunctioning machine must never be used. If
malfunctions are discovered, the machine must be
tagged and removed from service. Repairs to the
machine may only be made by a qualified service
technician, according to the manufacturers
specifications.
After repairs are completed, the operator must
perform a pre-operation inspection and function
tests before putting the machine into service.
Function Tests
1 Position the machine directly below the desired
work area.
2 Connect to the appropriate power source:
DC models: Connect the battery pack.
AC models: Connect to a grounded 15A AC
power supply. Use a 12 gauge / 3.3 mm
3-wire grounded extension cord no longer than
50 feet / 13 m.
Air models: Connect the airline.
3 Insert the key and turn to the on position OR
turn to platform control.
4 Pull out the red Emergency Stop button at the
ground controls.
Result: AC & DC Models: The power light should
come on.
Air models: The pressure gauge should read
80-110 psi / 5.5-7.8 bar.
Genie DPL Super Series
First Edition • Fifth Printing
2
Part No. 38132