Preparing The Load Cell; Preparing The Base Plate And Elastomer Bearing; Mounting The Elastomer Bearing Unit - Siemens SIWAREX WL230 Operating Instructions Manual

Base plate and elastomer bearing bb-s sa
Hide thumbs Also See for SIWAREX WL230:
Table of Contents

Advertisement

Installation
4.2 Installing the base plate and elastomer bearing
4.2.3

Preparing the load cell

Procedure
A data sheet is supplied with each load cell.
1. Keep the data sheet with the calibration values of the load cell.
2. Unpack the load cell.
3. Read the accompanying information sheet.
4. Read the operating instructions of load cell. SIWAREX WL200 Operating instructions
(https://support.industry.siemens.com/cs/ww/en/view/109749190)
4.2.4

Preparing the base plate and elastomer bearing

Procedure
1. Unpack the base plate and the elastomer bearing.
2. Check the
Product package for base plate (Page 6),
Scope of delivery for elastomer bearing 350 to 500 kg (Page 7) and
Scope of delivery for elastomer bearing 10 to 200 kg (Page 7).
4.2.5

Mounting the elastomer bearing unit

Procedure
22
Operating Instructions, 03/2020, A5E47358100-AA
BB-S SA

Advertisement

Table of Contents
loading

Table of Contents