ASSEMBLY INSTRUCTIONS
STEP 3:
Take the entire assembled top frame and insert on
top of the 3 vertical poles. If you are placing this into
an already built raised garden utilize the stake cover
hole
and slide the vertical poles through the
2
stake cover into the stake (see STEP 4 Image)
STEP 4
Garden
Raised Bed
OPTIONAL
To attach a second
veggie wall to the same
garden bed, attach a
cap, one L-connector
to a T-connector
show in the diagram on
the right. When you do
this, one vertical tube is
not needed.
STEP 4:
Open the green net
affix the net onto the frame, making sure to equally
space the cable ties along the tubes. Start at the top
affixing 5 ties to each of the horizontal tubes and
then affixing 6 ties to each of vertical tubes.
4
as
5
Customer Service: 1800-914-9835 | support@frameitall.com
STEP 3
1
12
completely. Use cable ties to
2
6
4
5
Need help?
Do you have a question about the Stack & Extend VEGGIE WALL and is the answer not in the manual?