INSTALLATION

Installation
10. Installation
factory settings
Internal anti-scalding protection
Connected load
Connected load options

Standard installation

Electrical connection from below on unfinished walls
Water connection on unfinished walls
For further installation options, see chapter "Alternative instal-
lation methods".
10.1 Standard installation
Opening the appliance
f Open the appliance by holding the fascia at the side and pull-
ing forwards away from the appliance cover. Undo the screw.
Pivot open the appliance cover.
f Remove the back panel by pressing the two locking tabs and
pulling the lower section of the back panel forwards.
Preparing the power cable on unfinished walls, for connection
from below
160
30
1 Cable entry installation aid
f Prepare the power cable.
9
| DHB-E LCD
DHB-E 11/13 LCD
°C
60
kW
13.5
x
DHB-E 11/13 LCD
x
x
Fitting the wall mounting bracket
f Mark out the holes for drilling using the installation tem-
f Drill the holes and secure the wall mounting bracket at 2
f Fit the wall mounting bracket.
Installing the twin connectors
1
f Seal and insert the twin connectors.
DHB-E 18 LCD 25A DHB-E 18/21/24 LCD
60
18
-
DHB-E 18 LCD 25A DHB-E 18/21/24 LCD
x
x
plate. If the appliance is to be installed on finished walls, also
mark out the fixing hole in the lower section of the template.
points using suitable fixing materials (screws and rawl plugs
are not part of the standard delivery).
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
DHB-E 27 LCD
60
60
21
27
x
-
DHB-E 27 LCD
x
x
x
x
www.stiebel-eltron.com