Download Print this page

OLT 6x6 Maximizer Assembly Manual page 21

Hide thumbs Also See for 6x6 Maximizer:

Advertisement

Gable Notch.
39.
With ridge board locked into gable notch, align ridge boards so they are flush together and secure
them with 8 - 1 1/4" screws (Part C). Important - if there is a gap between Ridge Boards, try pushing
rear wall and Door Header closer together from outside. Before moving on with further steps, confirm
your shed is square at wall height by checking the diagonal distance of the top walls on the inside. In
both directions, the distance should be approximately 95 1/2" depending on where you measure. It is
important that both diagonal measurements are approximately equal. If not, adjust walls until an equal
distance is achieved.
40.
With both ridge boards
connected, completely secure gable wall
framing to walls and rafters. Use 3 - 2"
screws (Part E) per Rafter. Use an
additional 6 - 2" screws (Part E) to
secure gable to top plate.
Note- you may have to remove the 2
temporary screws in gable wall from
Step 29 and reposition gable for best
fit prior to completing gable
attachment.
1 1/4" Screw
41.
Attach all Single and Double Rafter Brackets where rafters meet Top Wall Plates inside of
shed. Attach with 2 - 1 1/4" screws and 2 - 2" screws per Single Bracket and 6 - 2" screws per
Double Bracket.
Toll Free 1-888-658-1658
1 1/4" Screw
2" Screws
www.outdoorlivingtoday.com
Page 21
2" Screw
2" Screws
sales@outdoorlivingtoday.com
Screw
Ridge Boards
together with
1 1/4" screws
2" Screw

Advertisement

loading