Armitage Shanks Contour 21 Manual

Armitage Shanks Contour 21 Manual

Advertisement

Quick Links

CONTOUR 21
Check / measure top of key hole
1
positions in back of Trough.
3
Carefully drill wall.
Transfer those positions to wall to give required
2
front rim height. Mark positions on wall.
4
Insert and tighten fixations to ensure expansion
sleeves are 'locked in'.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Contour 21 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Armitage Shanks Contour 21

  • Page 1 CONTOUR 21 Check / measure top of key hole Transfer those positions to wall to give required positions in back of Trough. front rim height. Mark positions on wall. Carefully drill wall. Insert and tighten fixations to ensure expansion sleeves are ‘locked in’.
  • Page 2 Bolt under head distance to wall needs to be su cient to accommodate thickness of trough material. Ensure fixing points are level and bolts are fully anchored into wall. IMPORTANT NOTE: It is vitally important that when fixing the Wash Trough to a solid wall, substantial fixings (such as the Fischer TA M6 S/10) are used in the two key- hole anchor points.
  • Page 3 Going underneath Trough, mark positions on wall of holes in L brackets. Remove Trough. Drill and plug L bracket holes in wall. Mount Trough and screw to wall.
  • Page 4 If required, tighten key hole fixing points through gap in back (underneath Trough). Replace front panel. CUSTOMER CARE HELPLINE +44 0 844 543 6170 FAX LINE +44 (0)844 543 6171 email: aftersalesnonresidential@armitageshanks.co.uk We pursue a policy of continuing improvement in design and performance of our products. The right is, therefore, reserved to vary specifications without notice. Version 1.0 | August 2019...

This manual is also suitable for:

S0752 w4S0751 w4

Table of Contents