Viessmann KOB PYROMAT DYN 45 Instructions For Assembly And Installation page 38

Table of Contents

Advertisement

Installation (two Köb fitters) [Art. No. IMO-2 / 7387676]
Performance provided by the contractor (supplier):
Furnishing the entire scope of the delivery.
components contacted by fuel and exhaust gas for the scope of delivery cited. Also included is the installation of all the
switches, probes and sensors supplied (exceptions: weather sensors and heat consumers).
The installation will be carried out by two experienced fitters.
Price, incl. travel, expenses and overnight accommodation.
Performance provided by the client (buyer):
1.) Prior to installation of the burner system
a)
Equipping of construction site as follows:
Paved access road to the construction site;
230-V current supply line and, if necessary, 400 V for electric installation tools (welding apparatus);
b)
General construction work, as follows:
Making all the installation holes required for the installation;
Making the cement foundations and recesses for refill access lids and casings of extraction equipment;
Pits and breakthroughs for fuel conveying equipment
c)
Construction work in particular as follows:
Hydraulic sliding bar extraction system:
Moving and setting in concrete the securing brackets supplied (if included in the scope of the delivery);
Making the securing brackets (if not in the scope of the delivery). Due to the great forces that develop, this
performance should be furnished according to the instructions of an expert (architect or structural engineer) in
accordance with the supplier's specifications;
Making the chimney system with the connecting hole for the exhaust pipe (exception: metal chimney included in
the scope of the delivery);
d)
Draining the heating room and silo room with all the ducts and shafts required for installing the entire facility.
e)
Unloading the scope of the delivery from the truck unless the delivery has been expressly agreed with a crane
truck.
2.) After the installation of the burner system
a) Installation of the control cabinets delivered and/or the central control modules
Unless expressly agreed otherwise, these must be installed by the authorised electrician.
b) Installation of weather sensor and probes for the heat consumers in the scope of delivery:
These have to be installed by the authorised electrician.
c) Establishing the supply of electric current and carrying out the wiring unless expressly agreed otherwise:
Electric input, 3 x 400 V, PE, N with fuses on control cabinet.
Connecting cables between the control cabinet and the various motors and control units, connected on both
ends so as to be ready for operation.
d) Installation of the uninstalled water-bearing components included in the scope of delivery:
Water-bearing components included in the scope of delivery not factory connected, such as pumps, valves,
thermal run-off safety valves, accumulators, etc., must all be installed by the authorised heating engineer.
e) Sealing all the openings between the burner room and the fuel storage space, doing so according to the fire
prevention regulations.
Köb Holzheizsysteme GmbH, Flotzbachstr. 33, A-6922 Wolfurt, Tel. +43/5574/6770-0, Fax 65707, E-Mail: office@kob.cc
Spec Sheet
Installation Services
Installing the burner system, incl. all the machinery parts and facility
Subject to technical changes
1120-2
2009-03-01_GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kob pyromat dyn 85

Table of Contents