Exmark 116-8430 Operator's Manual page 12

Operator controlled discharge-hand
Table of Contents

Advertisement

Setup
Ream out the right hole to 11/32 inch
diameter.
Figure 12
1. Drill
2. 5/16-18 x 5/8 inch
carriage bolt
E.
Align the two holes in the mounting
bracket with the panel of the unit. Install
5/16-18 x 5/8 inch carriage bolt and 5/16
inch nyloc nut in the hole on the right side.
F.
Insert the handle assembly into the
mounting bracket as shown in Figure 13.
g012622
3. Mounting bracket
4. 5/16 inch nyloc nut
1. Handle assembly
2. Mounting bracket
G.
Insert the clevis pin through the handle
assembly hole, into the left hole of the
mounting bracket, and through the panel
of the unit. Secure the handle assembly
with hairpin as shown in Figure 13.
H.
For Vantage 48 and 52 units: Remove
the nut from the front panel guard, install
the loom clip, and replace nut as shown
in Figure 14.
Vantage 48 and 52
1. Front panel guard
2. Loom clip
For Vantage 60 units: Route the cable
under the RH frame rail, over the front
RH bellcrank and along the top rear of
the engine.
12
Figure 13
3. Clevis pin
4. Hairpin
Figure 14
3. Nut
g012623
g012690

Advertisement

Table of Contents
loading

Table of Contents