MODEL
CAPACITY
25 MKK-S
40 MKK-S
60 MKK-S
80 MKK-S
100 MKK-S
125 MKK-S
150 MKK-S
200 MKK-S
250 MKK-S
At first operation of the boiler, installation pipes should be cleaned up before the connection.
*
The most appropriate way is to flood water from one end of the pipes and to drain off at the
other side.
*Circulation pump must be installed on boiler water return pipe.
there must be enough working space left for technical service
*During installation,
intervention, boiler control, and fuel feeding
*Valve connection should be made on boiler water flow and return lines.
*Chimney connections should be leakproof, same diameter pipes without any narrowing
sections should be used from the exit of boiler to the chimney hole.
*Grounding connections should be done, electricity connection of circulation pump should be
done correctly. Only technical services are authorized at all electricity related breakdowns.
EXPANSION TANK
25.000 kcal/h
40.000 kcal/h
60.000 kcal/h
80.000 kcal/h
100.000 kcal/h
125.000 kcal/h
150.000 kcal/h
200.000 kcal/h
250.000 kcal/h
50 lt
75 lt
100 lt
200 lt
250 lt
275 lt
300 lt
500 lt
600 lt
8