Preparing The Machine; Installing The Weight - Exmark Quest 135-0332 Operator's Manual

60 inch bagger
Table of Contents

Advertisement

Note:
Determine the left and right sides of the
machine from the normal operating position.
1

Preparing the Machine

No Parts Required
Procedure
1. Park the machine on a level surface and
disengage the drives.
2. Engage the parking brake.
3. Shut off the engine and remove the key.
4. Wait for all moving parts to stop before leaving
the operating position.
5. Ensure that the machine is secure from
movement and allow surfaces to cool before you
begin to work on it.
6. Clean the machine of any debris on the machine
deck or rear part of the machine to ease
installation.
2

Installing the Weight

Parts needed for this procedure:
1
Weight-tray
1
Weight-tray mount, left
1
Weight-tray mount, right
1
Suitcase weight—16 kg (35 lb)
1
Retaining rod
2
Bolt (3/8 x 1-1/4 inches)
4
Flange nut (3/8 inch)
2
Bolt (3/8 x 1 inch)
Procedure
CAUTION
The bagger changes the weight distribution of
the machine. Operating the machine without
the front weights may cause an unstable
condition which could result in a loss of
control.
Ensure the front weights are properly installed
before operating the machine with the bagger
attachment.
1. Use the 2 self-tapping bolts (5/16 x 3/4 inch), 2
bolts (3/8 x 1 inch), and flange nuts to secure
the weight-tray mount to the machine
6
(Figure
3).

Advertisement

Table of Contents
loading

Table of Contents