Connecting With The Discharge Tube - Exmark Quest 135-0332 Operator's Manual

60 inch bagger
Table of Contents

Advertisement

1
2
3
4
5
Figure 18
1. Discharge chute
2. Hand knob
3. Washer
6. Install a washer and hand knob over the post
coming through the chute top
7. Hand tighten the knob to secure the chute to the
mower deck.
8. Hook the flexible latch on the chute to the
retaining clasp welded to the side wall of the
mower deck
(Figure
Figure 19
1. Retaining clasp
G013097
6
4. Folded metal bracket
(chute)
5. Forward vertical plate
(deck)
6. Exposed post in the mower
deck (curved baffle)
(Figure
18).
19).
G013098
2
1
2. Flexible latch
8
Connecting with the
Discharge Tube
Parts needed for this procedure:
1
Discharge tube
Procedure
1. Slide the curved end of the discharge tube into
the opening in the bagger top
1
g013097
3
1. Discharge tube
2. Opening in bagger top
3. Flared end of discharge
tube
2. Slide the flared end of the discharge tube over
the end of the chute. Move the rubber retaining
strap on the chute snaps over the peg on the
discharge tube to secure it
3. After the bagger installation, install the wire onto
the spark plug(s).
g013098
13
(Figure
2
5
4
Figure 20
4. Peg
5. Rubber strap
(Figure
20).
G010641
g010641
20).

Advertisement

Table of Contents
loading

Table of Contents