Chapter 2; Getting Started; Unpacking And Inspection; Reshipment Instructions - Racal Instruments X Series Manual

Adapt-a-switch carrier module
Table of Contents

Advertisement

1260-100X User Manual
Unpacking and
Inspection
Reshipment
Instructions
Racal Instruments © 2005
1. Before unpacking the switching module, check the
exterior of the shipping carton for any signs of damage.
All irregularities should be noted on the shipping bill and
reported.
2. Remove the instrument from its carton, preserving the
factory packaging as much as possible.
3. Inspect the switching module for any defects or damage.
Immediately notify the carrier if any damage is apparent.
4. Have a qualified person check the instrument for safety
before use.
1. Use the original packing material when returning the
switching module to Racal Instruments for servicing. The
original shipping carton and the instrument's plastic foam
will provide the necessary support for safe reshipment.
2. If the original packing material is unavailable, wrap the
switching module in an ESD Shielding bag and use plastic
spray foam to surround and protect the instrument.
3. Reship in either the original or a new shipping carton.

GETTING STARTED

Getting Started 2-1

Chapter 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

1260-100x

Table of Contents