Advertisement

Quick Links

This user's guide describes the operational use of the TLV767EVM-014 evaluation module (EVM) as a
reference design for engineering demonstration and evaluation of the TLV76701DRV, low-dropout linear
regulator (LDO). Included in this user's guide are setup and operating instructions, thermal and layout
guidelines, a printed circuit board (PCB) layout, a schematic diagram, and a bill of materials (BOM).
Throughout this document, the terms demonstration kit, evaluation board, and evaluation module are
synonymous with the TLV767EVM-014.
Table 1
lists the related documentation available through the Texas Instruments web site at www.ti.com.
SBVU049 – November 2018
Submit Documentation Feedback

TLV767EVM-014 Evaluation Module

Figure 1. TLV767EVM-014 Evaluation Module
Table 1. Related Documentation
Device
TLV767
Copyright © 2018, Texas Instruments Incorporated
SBVU049 – November 2018
Literature Number
SLVSE84
TLV767EVM-014 Evaluation Module
User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLV767EVM-014 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TLV767EVM-014

  • Page 1: Tlv767Evm-014 Evaluation Module

    TLV767EVM-014 Evaluation Module Figure 1. TLV767EVM-014 Evaluation Module This user’s guide describes the operational use of the TLV767EVM-014 evaluation module (EVM) as a reference design for engineering demonstration and evaluation of the TLV76701DRV, low-dropout linear regulator (LDO). Included in this user’s guide are setup and operating instructions, thermal and layout guidelines, a printed circuit board (PCB) layout, a schematic diagram, and a bill of materials (BOM).
  • Page 2: Table Of Contents

    Bottom Layer Routing ....................TLV767EVM-014 Schematic List of Tables ..................... Related Documentation ...................... TLV767EVM-014 BOM Trademarks All trademarks are the property of their respective owners. TLV767EVM-014 Evaluation Module SBVU049 – November 2018 Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 3: Introduction

    Introduction Texas Instruments' TLV767EVM-014 EVM helps design engineers evaluate the operation and performance of the TLV767 family of linear regulators for possible use in their own circuit application. This particular EVM configuration contains a single linear regulator. The regulator is capable of delivering up to 1 A to the load.
  • Page 4: Evm Setup

    EVM Setup www.ti.com EVM Setup This section describes how to properly connect and setup the TLV767EVM-014, including the jumpers and connectors on the EVM board. Input/Output Connector and Jumper Descriptions 2.1.1 J1 – IN Input power-supply voltage connector. Twist together the positive input lead and ground return lead from the input power supply, and keep them as short as possible to minimize input inductance.
  • Page 5: Soldering Guidelines

    2. Enable the output by jumping J5 (the EN pin) to VIN. 3. Vary the respective load and input voltage, as necessary, for test purposes. SBVU049 – November 2018 TLV767EVM-014 Evaluation Module Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 6: Pcb Layout

    PCB Layout www.ti.com PCB Layout Figure 2 Figure 4 illustrate the PCB layout for this EVM. Figure 2. Assembly Layer Figure 3. Top Layer Routing TLV767EVM-014 Evaluation Module SBVU049 – November 2018 Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 7: Bottom Layer Routing

    PCB Layout www.ti.com Figure 4. Bottom Layer Routing SBVU049 – November 2018 TLV767EVM-014 Evaluation Module Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 8: Schematic

    Iout Up to 1 A IN_S OUT_S 2.2uF 2.2uF 2.2uF 2.2uF FB/SYS IN_S OUT_S TLV76701DRVR 51.1k 1000pF OUTPUT VOLTAGE 102k 16.2k 9.76k 3.65k Figure 5. TLV767EVM-014 Schematic TLV767EVM-014 Evaluation Module SBVU049 – November 2018 Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 9: Bill Of Materials

    These assemblies must comply with workmanship standards IPC-A-610 Class 2. Unless otherwise noted in the Alternate Part Number or Alternate Manufacturer columns, all parts may be substituted with equivalents. SBVU049 – November 2018 TLV767EVM-014 Evaluation Module Submit Documentation Feedback Copyright © 2018, Texas Instruments Incorporated...
  • Page 10 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 11 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 12 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧ください。http:/ /www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 3.4 European Union 3.4.1 For EVMs subject to EU Directive 2014/30/EU (Electromagnetic Compatibility Directive): This is a class A product intended for use in environments other than domestic environments that are connected to a low-voltage power-supply network that supplies buildings used for domestic purposes.
  • Page 13 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2018, Texas Instruments Incorporated...
  • Page 14 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2018, Texas Instruments Incorporated...

This manual is also suitable for:

Tlv76701drv

Table of Contents