Checking the Installation
No.
Description
1
No object must be placed on the chassis.
All the cables are bound with proper tightness. The space between the
cable ties is even, and the remaining parts of the cable ties are cut off
2
neatly. All cable ties face the same direction, keeping the overall
appearance nice.
The cross-sectional area of the power cable and PGND cable complies
3
with the engineering design, and satisfy the requirements of equipment
running.
The power cable and PGND cable use a whole segment of copper core.
4
The cable has no connection in the middle or scratch on the skin.
The power cable and PGND cable must be routed horizontally and
5
vertically without crossover. Proper margins must be reserved at the
turning.
The power cable and PGND cable must be connected correctly and
6
reliably.
The identifiers on the power cable and PGND cable must be correct,
7
legible, and neat.
The power cable, PGND cable, and signal cables must be routed
8
separately.
Signal cables must be long enough, and must not be damaged or broken,
9
without joint in the cable.
The connectors of the signal cables must be neat and intact. The
10
connectors must be connected correctly and firmly. The tips must be
connected securely.
Labels at both ends of the signal cables must be marked correctly, clearly,
11
and neatly.
12
Tighten screws have been confirmed.
13
The optical power must be within the preset PON power range.
14
Excess cables inside the device are neatly routed after cable deployment.
19
Method
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe
Observe