FAQs for Installation
Keep off electromagnetic
interface.
Signal cables should
be routed separately
from power cables.
The paint on the ground
point should be removed
to ensure proper
grounding.
After the cable is
connected to the ground
point, the ground point
should be repainted.
Metal wires of optical
cables should be
grounded.
Use a dedicated
lightning protection bar.
Do not route PGND
cables or subscriber
cables into the room in
the overhead mode.
When routing cables out of
the network cabinet,
ground the outer jacket of
the cable to the nearest
ground point on the
network cabinet side, or
use the metal tube that is
grounded to route cables.
Do not distort cables.
23
Repaint the place that is
collided.
Connect the PGND cable
to the ground bar.
Coil and protect the
redundant optical fiber in
the fiber management tray,
other fiber management
parts, or the place
convenient for operation.
The ends of the optical
fiber that is not used should
be protected with dustproof
caps.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
People's Republic of China
Shenzhen 518129
www.huawei.com