Operation; Instrument Panel Control Functions; New Machine Break-In Procedures - Doosan DL160 Operation And Maintenance Manual

Table of Contents

Advertisement

Before operating any wheel loader, read and understand
"Operating Controls" section of this manual.
INSTRUMENT PANEL CONTROL
FUNCTIONS
Monitoring System
Monitoring system uses network circuits between control system
and sensors installed at various machine system locations to
monitor selected conditions. The monitoring systems function is
to continually inform the operator of machine's condition.
Displays and gauge readouts on instrument panel provide
information such as engine speed, engine coolant temperature,
transmission oil pressure, and electrical charge status.
NEW MACHINE BREAK-IN
PROCEDURES
All wheel loaders are inspected and adjusted before leaving the
factory. However, it is required that the operator follow these
steps during initial break-in period. Failure to follow these steps
may result in damage to equipment or reduced performance.
1.
Make sure to check all fluid levels before starting and every
8 - 10 operating hours.
2.
Do all Daily maintenance and service checks.
3.
For first 50 operational hours, as shown by hour meter on
control console, do not exceed 80% of maximum rated
engine speed.
4.
At end of first 50 operational hours, drain engine oil.
Replace engine oil filter and engine oil.

Operation

WARNING!
Operation
3
OP000755
OP000755
3-1

Advertisement

Table of Contents
loading

Table of Contents