STEP 8:
Checking Material
Discharge from Feeder
(continued)
10
Figure 2-7.
Checking for Proper Material Discharge from Feeder to Vacuum Base
4. Check to make sure the material is still under the hold-down
roller bearings and also resting on the vacuum base transfer
section.
5. Trap the feeder in-between the side guides until they gently
touch. Tighten side guide knobs.