Download Print this page

Sunstream FL15023 Operation And Installation Manual

Hide thumbs Also See for FL15023:

Advertisement

Quick Links

FL15023
TM
OPERATION AND INSTALLATION MANUAL
READ CAREFULLY.
KEEP THESE INSTRUCTIONS.
COPYRIGHT 2008 SUNSTREAM CORPORATION - ALL RIGHTS RESERVED
FORM NO.
690249 OPERATION
REV.
A
PAGE 1 OF 15

Advertisement

loading
Need help?

Need help?

Do you have a question about the FL15023 and is the answer not in the manual?

Questions and answers

Alan
May 16, 2025

When the lift is up, where should the oil level be?

1 comments:
Mr. Anderson
May 22, 2025

The oil level should be between the "ADD" and "FULL" marks on the dipstick when the Sunstream FL15023 lift is in the up position.

This answer is automatically generated

Summary of Contents for Sunstream FL15023

  • Page 1 FL15023 OPERATION AND INSTALLATION MANUAL READ CAREFULLY. KEEP THESE INSTRUCTIONS. COPYRIGHT 2008 SUNSTREAM CORPORATION - ALL RIGHTS RESERVED FORM NO. 690249 OPERATION REV. PAGE 1 OF 15...
  • Page 2 These assembly and installation instructions have been provided by Sunstream Corporation at the request of the potential installer and/or assembler. If you are not an authorized Sunstream Dealer and are not a reasonably skilled mechanic, please contact Sunstream so that we can refer you to a local dealer who can skillfully and safely perform the assembly and installation of your Sunstream boatlift.
  • Page 3 SAFETY IF YOU HAVE ANY QUESTIONS, PLEASE CALL YOUR DEALER OR sUNSTREAM AT (888) 786-5438. SAVE THESE INSTRUCTIONS YOUR SAFETY AND THE SAFETY OF OTHERS IS VERY IMPORTANT. PROPER USE OF THE INFORMATION IN THIS MANUAL WILL HELP AVOID POTENTIAL HAZARDS THAT COULD CAUSE DAMAGE TO PORPERTY AND OR PERSONAL INJURY.
  • Page 4 SAFETY FORM NO. 690249 OPERATION PAGE 4 OF 15...
  • Page 5 PRIOR TO LAUNCH • ENSURE ALL COTTER PINS ARE BENT AND SECURE. • ALL NUTS ARE TIGHT. • HYDRALIC HOSES ARE NEATLY WIRE-TIED TO FRAME AND ARE CLEAR FROM PINCH POINTS. • BATTERY TERMINALS AND ALL FITTINGS ARE TIGHT. • RESEVOIR SEAL-CAP IS REMOVED (UNDER BREATHER CAP).
  • Page 6 INSTALLATION ANY QUESTIONS, PLEASE CALL YOUR DEALER OR SUNSTREAM AT (888) 786-5438 INSTALLATION INSTRUCTION AND DIAGRAMS FOLLOW. THESE INSTRUCTIONS AND DIAGRAMS INFORMATION ABOUT HOW TO SECURELY AND SAFELY INSTALL THE FLOAT LIFT. ADHERING TO THESE INSTRUCTIONS AND DIAGRAMS, HOWEVER, PROVIDES NO GUARANTEE THAT THE INSTALLATION WILL BE SAFE AND SECURE.
  • Page 7 OPERATION ANY QUESTIONS, PLEASE CALL YOUR DEALER OR SUNSTREAM AT (888) 786-5438 ENERGIZE CONTROL BOX SWITCH THE ON/OFF SWITCH ON THE RC UNIT TO *ON* POSITION. REMOVE THE RESERVOIR AND DISCASRD THE SHIPPING PLUG UNDERNEATH THE CAP. REPLACE THE RESERVOIR CAP.
  • Page 8 MOORING THE FOLLOWING DIAGRAMS DEPICT THE FLOAT LIFT IN DIFFERENT DOCK CONFIGURATIONS. FLOATING DOCK WITH A HEIGHT LESS THAN 3'(91cm) ABOVE WATER AND A DOCK LENGTH GREATER THAN THE FLOAT LIFT. SPRING LINE KIT, FENDERS AND CLEATS. FLOATING DOCK WITH A HEIGHT LESS THAN 3'(91cm) ABOVE WATER WITH A SINGLE OVERHANG.
  • Page 9 MOORING Tide Fluctuations or Docks over 3' (91cm) SLIDING CLEAT SYSTEM 1. d = 4’, item#FA-TS-48 2. d = 5’, item#FA-TS-60 HEAVY DUTY SLIDING CLEAT SYSTEM 1. d = 4’, item#FA-YS-48 2. d = 5’, item#FA-YS-60 FORM NO. 690249 OPERATION PAGE 9 OF 15...
  • Page 10 LIFTS IN COASTAL AREAS NEAR OCEAN DETERIORATE MORE RAPIDLY AND NEED TO BE CHANGED MORE FREQUENTLY. EFFECTS OF GALVANIC CORROSION ARE NOT COVERED BY YOUR SUNSTREAM WARRANTY. FAILURE IN MAINTAINING ZINCS ON THE LIFT CONSTITUTES ABUSE AND THEREFORE VOIDS THE SUNSTREAM WARRANTY.
  • Page 11 REMOTE CONTROL RE-PROGRAM INSTRUCTION If your remote will not work, first check to see that it is transmitting. Do this by depressing any of the three buttons and watching to see that the red LED light is working. If so, then the next step is to re-program the receiver..
  • Page 12 (or with a reserve capacity of 160 Amp Hours). Reserve capacity is the most important feature. Battery Capacity: The FL15023 was tested to have an energy capacity of approximately 8 full cycles at using a new battery with a reserve capacity of 160 Ah. However, try to not dip below 50% battery capacity, since the solar panel would have difficulty in recovering from such a deep draw.
  • Page 13 • Use Sunfluid™ hydraulic fluid to replace any loss fluid in the hydraulic pump. • Inspect and replace zincs if necessary. If any Sunstream Product is used in salt or brackish water, the Purchaser agrees that proper maintenance requires that the Purchaser shall attach, maintain, and regularly check sacrificial anodes, also known as “zincs”, to the Product to prevent electrolysis and that failure to attach...
  • Page 14 TROUBLESHOOTING TIPS FORM NO. 690249 OPERATION PAGE 14 OF 15...
  • Page 15 FORM NO. 690249 OPERATION PAGE 15 OF 15...