Compact plant built together in or- PERMAQ ® tion and operation of the BWT der to take up a little space as pos- Compact plant and PERMAQ ® Compact plant.
Note! Fit the built-in flowmeter to the cabinet. PLANT The raw water, which is to be Connection of permeate treated in the BWT PERMAQ ® The plant must be placed in a non- (treated water) Compact plant, must be drinking freezing environment on an even Fit the ¾”...
3) complete and close the recir- 98 % applies by 75 % recovery. amount at maximum 50-300 l/h culation valve (D-Figure 3). Contact BWT or the supplier of ® for BWT PERMAQ Compact Now switch on the 230 Volt 50 your plant to decide which outlet 111–116 respectively, at a temp.
Note! The transport pump (G- AUTOMATIC FUNCTIONS capacity is 6 % below the normal 200 l/h, i.e. 188 l/h. At the same Figure 3) will not start until the res- time make sure that the pressure on ervoir tank has been completely PERMAQ ®...
MAINTENANCE AND TROUBLE-SHOOTING Maintenance ® The BWT PERMAQ Compact plant is produced and designed for a minimum of servicing and maintenance. How- ever, there are certain functions which should be checked regularly. Maintenance intervals should be performed once a week – read section 13.5 Operating Journal.
Trouble-shooting This section deals with the problems that may arise on the plant. 9.2.1 The plant capacity has dropped 9.2.2 The quality of the treated water is higher than 20 µS/cm...
9.2.10 Survey of Alarm Conditions LED function: In normal operation the LED’s are lit corresponding to the components they represent. “Re-start ALARM” on TP-pump: (Nothing is working - permanent Section 9.2.8 condition) ALARM - Too high water level: (Nothing is working - permanent Section 9.2.6 condition) Restore raw water pres-...
It is possible to change the various time settings for Start, Stop and Alarm, plus start-up delay of pumps. Use of DIP-switch: No. 1 High-pressure pump No. 2 Transport pump ® No. 3 Selection of BWT PERMAQ Compact model Nos. 4-6 Transport pump 10. TECHNICAL SPECIFICATION 10.1 Technical specifications ® BWT PERMAQ...
BWT PERMAQ Com- ing, it is recommended to per- high-pressure pump. The desali- pact 111-116 from BWT and fill form the cleaning procedure nated water/permeate is then in 25 litres of warm raw water from the start once more with a led to consumption and can e.g.
Note! When the hose must be If, after this cleaning, the ca- pacity of the membranes is still pressed hard in to push-in fitting not satisfactory, the membranes until it clicks . must be discarded and new When all connections have been ones must be installed.
NO, the problem does not concerns the plant or the installation The plant - we mean only the part of the whole installation which was delivered by BWT (i.e only the plant). The installation - we mean the piping etc. leading to the plant.
13.5 Operating Journal Maintenance intervals should be performed once a week. Replacement frequency of wearing parts shown in ® section 13.6 Spare Parts List BWT PERMAQ Compact 111-116.