Pump Control I/O Pcb - Gasboy TopKAT Installation Manual

Fuel management system
Table of Contents

Advertisement

Mechanical PCU Option

Pump Control I/O PCB

The Pump Control I/O PCB, shown in
cover plate. In order to set the jumpers and switches on the I/O PCB, you must remove all the
connectors and the cover plate.
Figure 7-10: Pump Control I/O Cover Plate and PCB
1
Remove the five green connectors from the front of the Pump Control I/O board. Remove the
board from the card cage in the same manner as the EXPMUX Pump Control CPU board.
2
Remove the four Phillips
plate.
Pulse Connection: Verify that the K1 through K4 jumpers (pulse type jumpers) match the type
3
Page 86
Figure
7-10, consists of two parts: the PCB itself and a
screws securing the cover plate to the PCB and remove the cover
®
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
Pump Control I/O PCB

Advertisement

Table of Contents
loading

Table of Contents