Mechanical Interface Option

Wiring Diagrams

Figure 5-4: Wiring Diagram: Veeder-Root
Figure 5-5: Wiring Diagram: Veeder-Root Electronic Pulser, 7671 Series 100:1
Pulser Wiring Notes
All pulsers above are shown connected to hose 1.
1
Jumpers on the Pump Control PCB must be properly jumpered according to the pulser type.
2
This should be done by the person performing the start-up. Power to the system must not be
turned on prior to this set-up.
3
See
4
When installed in a separate DC conduit, 18 AWG wires are required for installation.
Although it is recommended that DC pulser wires be run in a conduit separate from AC wires,
they can be combined in the same conduit with AC wires providing UL-Listed cable with the
following specifications is used:
Page 42
"Conduit Layout" on page 33
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
Reed Switch Pulser, 1871 Series 10:1
®
for detailed system installation specifications.