Gasboy TopKAT Installation Manual page 125

Fuel management system
Table of Contents

Advertisement

Port Communication Wiring
Port Communication Wiring
The following diagrams show the pin-to-pin layout of the possible wiring schemes for the
TopKAT ports. Each port may be wired for any of the wiring schemes provided the
installation requirements are met as outlined in
Figure 8-4: RS-232 - D Connector
Note: In the TopKAT, the green connector goes to P4 on the communication board for port 2
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
and P6 for port 3. The K1 & K2 jumper for the port being used should be set to RS-232.
See
"Terminal Block ID" on page 26
Series 9800 Field Installation
"Communication Requirements" on page
for the location of K1 & K2 jumpers.
17.
Page 113

Advertisement

Table of Contents
loading

Table of Contents