11 – Testing
Completion Check List
The information below will help verify proper installation of the TopKAT System. Review it
before testing the pumps and/or dispensers in the manual, override position.
1
Is the optional data terminal located in a clean, office-type environment?
2
Is the optional external modem located in an office-type environment or a protective
enclosure?
Is all the wiring in metal conduit? (See
3
exception to the metal conduit rule is RS-422 as noted in
page
Is the AC and DC wiring in separate conduits, troughs, etc.- except as noted in
4
Short Haul Modems" on page
5
Is the system/peripheral equipment on a separate dedicated breaker? (See
Requirements" on page
6
Is the system grounded properly? (See
7
Is the correct gauge wire installed for the communication lines?
8
Are the communication lines under the maximum allowable distance.
• RS-232: 100 feet
• RS-422: 1500 feet except as noted in
If the system has an internal modem, is the phone line installed?
9
page
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
24.
17).
12)
"Conduit Requirements" on page
24?
"Power Requirements" on page
"RS-422 - Short Haul Modems" on page
15). The only
"RS-422 - Short Haul Modems" on
"RS-422 -
"Power
17).
("Wire Size" on page
("Internal Modem" on
Testing
19)
24.