Before Operation - Daikin FCAHG71HVEB Installer And User Reference Manual

Hide thumbs Also See for FCAHG71HVEB:
Table of Contents

Advertisement

14
|

Before operation

14 Before operation
Installer and user reference guide
60
WARNING
This unit contains electrical and hot parts.
WARNING
Before operating the unit, be sure the installation has been carried out correctly by
an installer.
CAUTION
It is unhealthy to expose your body to the air flow for a long time.
CAUTION
To avoid oxygen deficiency, ventilate the room sufficiently if equipment with burner
is used together with the system.
CAUTION
Do NOT operate the system when using a room fumigation-type insecticide.
Chemicals could collect in the unit, and endanger the health of people who are
hypersensitive to chemicals.
NOTICE
Be sure to turn ON the power 6 hours before operation in order to have power
running to the crankcase heater and to protect the compressor.
This operation manual is for the following systems with standard control. Before
initiating operation, contact your dealer for the operation that corresponds to your
system type and mark. If your installation has a customised control system, ask
your dealer for the operation that corresponds to your system.
Operation modes:
Heating and cooling (air to air).
Fan only operation (air to air).
FCAHG71~140HVEB
Split system air conditioners
4P561449-1B – 2021.07

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcahg100hvebFcahg125hvebFcahg140hveb

Table of Contents