Daikin FCAHG71HVEB Installer And User Reference Manual page 30

Hide thumbs Also See for FCAHG71HVEB:
Table of Contents

Advertisement

6
|
Installation
Installer and user reference guide
30
a
a Centre of the unit
b Centre of the ceiling opening
c Paper pattern for installation (upper part of the packing)
d Screws (accessories)
Ceiling opening and unit:
-
Make sure the ceiling opening is within the following limits:
Minimum: 860 mm to be able to fit the unit.
Maximum: 910 mm to ensure enough overlap between the decoration panel
and the suspended ceiling. If the ceiling opening is larger, add extra ceiling
material.
-
Make sure the unit and its hanger brackets (suspension) are centered within
the ceiling opening.
a
b
c
d
e
f
a Drain piping
b Refrigerant piping
c Hanger bracket pitch (suspension)
d Unit
e Ceiling opening
f Decoration panel
Example
A
B
C
(a)
A: Ceiling opening
B: Distance between the unit and the ceiling opening
C: Overlap between the decoration panel and the suspended ceiling
Installation guide. Use the installation guide to determine the correct vertical
position.
b
c
d
710
840
860~910
950
(mm)
If A
860 mm
910 mm
(a)
Then
(a)
B
10 mm
35 mm
FCAHG71~140HVEB
Split system air conditioners
4P561449-1B – 2021.07
(a)
C
45 mm
20 mm

Advertisement