Completing the cabling

Completing the cabling procedure
1.
2.
3.
4.
5.
6.
7.
8.
66 (72)
© Nokia Corporation
Nokia Proprietary and Confidential
All manuals and user guides at all-guides.com
Route the cables through the opened cable entry block, as presented earlier
in Figure 17.
Close the cable entry block with the two Allen screws. Use a torque driver
with a 4 mm Allen bit.
Replace the sealing strip around the cable entry block.
Route the antenna feeder cables and power supply cable to the front of the
perforated plastic panel (see [1] in Figure 26). Fix the cables to the
perforated panel with cable ties. Use side-cutting pliers to cut off the
extruding parts of the cable ties.
Route the transmission cables, the grounding cable and the cables coming
from the interface unit behind the perforated plastic panel at the lower edge
of the BTS (see [2] in Figure 26). Fix the cables to the perforated panel with
at least two cable ties. Use side-cutting pliers to cut off the extruding parts
of the cable ties.
Attach the cable cover support on the grips at the far end of the perforated
panel (see [A] in Figure 26).
Push the cables towards the cable cover support at the far end of the
perforated panel.
Place the cable cover onto the hook at the near end of the perforated panel.
Align it to the recesses on the cable cover support and slide it downwards
until it locks to the cable cover support (see [B] in Figure 26).