Nokia MetroSite EDGE Installation Manual page 56

Table of Contents

Advertisement

Connecting the power supply cable to the power supply unit
1.
2.
3.
Note
DC power can be fed in with three separate conductors. In this case, reverse the
rubber sealing piece so that the three small recesses are facing each other and
form three small holes (see Figure 19). Use the three holes for routing the
conductor cables.
4.
5.
56 (72)
© Nokia Corporation
Nokia Proprietary and Confidential
All manuals and user guides at all-guides.com
Make sure that the site's mains power supply is switched OFF and that the
switch on the power supply unit is in the stand-by position.
Open the connector shield by loosening the retaining screws with a torque
driver and a T10 Torx bit (see Figure 19).
Open up the rubber sealing piece and route the power supply cable through
it. Close the sealing piece.
Connect the power supply cable to the power connector in the power
supply unit.
Close the power supply connector shield and tighten the screws.
Installation
DN991456
Issue 3 en

Advertisement

Table of Contents
loading

Table of Contents