Position the two offset screws which are attached to the L-beam (on the
back of the cabinet) into the offset screw slots in the lower part of the
mounting rack, as shown in the inset illustration in Figure 7.
Tighten the upper BTS fixing screws (B1 and B2 in Figure 11) to 5.5 Nm
(4.06 lb ft) using a torque driver with a 4 mm Allen bit.
Tighten the offset screws on the L-beam from the underside. Use a torque
socket spanner/wrench with a 6 mm Allen bit and an 80 mm extension to
tighten to 12 Nm (8.85 lb ft).
If you have removed any BTS units, proceed to Chapter 7. If you have not
removed any units proceed directly to Chapter 8.