3.2.1

BTS interfaces and cables

Depending on the site solution, check that the appropriate interface units and
cables are on the site if cabling is to be completed during one installation. Details
of the required connectors and cables are found in Nokia MetroSite EDGE Base
Station: Requirements for Installation and Operation.
Note
Diversity cables are delivered with the BTS in the transportation package.
3.3

Installation equipment

Make sure that all the necessary installation equipment is available on the site
before beginning installation. Refer to Table 2 for tools and Table 3 for parts.
Detailed information on the installation equipment can be found in Nokia
MetroSite EDGE Base Station: Requirements for Installation and Operation.
Table 2.
Tool
Torque driver with 60 mm shaft and:
Torque socket spanner/wrench with 80
mm extension shaft and:
Torque key
Side cutting pliers
Crimping tool
16 (72)
© Nokia Corporation
Nokia Proprietary and Confidential
All manuals and user guides at all-guides.com
Installation equipment checklist
T10 Torx bit
4 mm Allen bit
6 mm Allen bit
8 mm hexagon socket
10 mm hexagon socket
Notes
Required for:
Unit retaining screws
BTS fixing screws, cable entry block
screws, ground cable fixing
Required for:
Bolts in pole brackets, L-beam
screws
Locking device for pole brackets,
grounding cable nut
Removing grounding bridges on
transmission units
For attaching diversity cables
For cutting cable ties and preparing
grounding cable for crimp terminal
For attaching crimp connector to cable in
grounding alternative 1