Clearance; Tools & Safety Gear Required; Appearance And Dimensions; System Clearance - LG HBP10H Installation Instructions Manual

Residential battery unit
Hide thumbs Also See for HBP10H:
Table of Contents

Advertisement

3.1.5

Clearance

Recommended clearances for the left, right and top of the product are shown in the fi gure for
the proper ventilation and installer convenience.
Ceiling
500 mm
(20")
300 mm
300 mm
(12")
(12")
Floor
<Standing type>
3.1.6
Tools & Safety Gear Required
• Tools
The following tools are required to install the battery pack :
Precision screwdriver
M5 torque wrench
Drill
Pencil or marker
(min. diameter 10 mm, 0.4")
* The fasteners are needed for fi xing the bracket on the wall.
• Safety Gear for Personal Protection
It is required to wear the following safety gears when handling the battery pack.
Insulated gloves
3.1.7

Appearance and Dimensions

• Appearance
Proper handling and care are recommended as disassembly, change of color,
scratches, leakage of liquid, and stains may infl uence the economic value of the
battery pack.
• Pack appearance and dimensions
817 mm
(32.2")
504 mm
295 mm
(19.8")
(11.6")
7
Ceiling
500 mm
(20")
300 mm
300 mm
(12")
Floor
<Wall Mounting type>
Inclinometer
Tape measure
Safety goggles
Safety shoes
14
• Color and materials
- Battery Module front/rear case:
metallic gray, steel
- Battery Control Unit cover &
Module Connect Plate: metallic gray,
aluminum
- LED cover: black, plastic
3.1.8

System Clearance

The battery requires adequate clearance for installation, cabling, and airfl ow. The minimum
clearance for system confi guration is provided below. The cable connecting between battery
pack and inverter should be in accordance with the installation guide manual of the inverter.
NOTE
An external DC isolator may be installed within the clearance zone. Minimum clearances
may be greater according to local regulations.
(12")
500mm
500mm
(20")
(20")
300 mm
(12")
300mm
300mm
(12")
(12")
<Standing type>
3.1.9

Installing the Battery Pack

3.1.9.1 Standing Type
CAUTION
Make sure that the inverter AC and DC disconnects are turned off before connecting the
power cable to the battery pack.
Install the battery pack through the following steps:
Drill
RESU
10H
Temp
Prime
late
Wall
Front
MODULE CONNECT
LATE 1
Rear
Ceiling
Ceiling
300mm
300mm
(12")
(12")
Inverter
Inverter
Floor
Floor
1. Place the Drill template to the wall
Area1
Area2
Area1
Area2
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
Ex) If min. clearance is 200mm,
Ex) If min. clearance is 200 mm,
* Recommended fastener count:
203 mm
OK
203mm
Ok
305 mm
OK
305mm
Ok
* Recommended fastener diameter/
* Fastener separation should observe
* Check "LG HBP10H Standing"
2. Place a spacer to the position marked
on the Drill template. After that, place
the Module connect plate in contact
with the Spacer and align center lines.
* Pay attention to the direction of
Front
Front
* Do not use anchor bolts to fi x the
Wall
direction
Wall direction
* Be careful not to damage the
Ceiling
Ceiling
500mm
500mm
(20")
(20")
300mm
300mm
(12")
(12")
Inverter
Inverter
300mm
300mm
(12")
(12")
300mm
(12")
Floor
<Wall Mounting type>
1(Area1)/1(Area2)
length: 10mm/40mm Min.
the regional building code.
on the middle side of Drill
Template before drilling.
the Spacer. Refer to left image for
correct orientation.
Module connect plate to the fl oor.
aluminum foil attached on the
bottom of Module connect plate
during handling.