LG HBP10H Installation Instructions Manual page 10

Residential battery unit
Hide thumbs Also See for HBP10H:
Table of Contents

Advertisement

19. Re-attach the top cover.
20. Open the front cover.
Handle
Front Cover
21. Loosen 6 bolts and remove the Front
M5 PH Bolt 6ea
Front Protection Cover
22. Assemble the adapter or cap
Hole #2
Hole #1
Connector for
Ethernet cable
* Tighten the M5xL65 Flange Bolt
(4ea) with a torque of 5N·m.
* Hold the handle and turn it
counterclockwise.
Protection Cover.
* Be careful not to drop the bolts into
the pack at this stage.
according to regional regulations.
Insert the RMD ethernet cable
through Hole #2 and connect the
cable. Then proceed to Section 3.2
Installation for Remote Monitoring
Device (RMD).
23. Assemble the adapter or cap
Internal cable
Hole #2 Communication cable
Hole #1 Power cable
24. Connect the cables according to their
25. Arrange the power cables and
26. Re-attach the Front Protection Cover
Front Protection Cover
M5 PH Bolt 6ea
27. Close the front cover.
Handle
Handle
according to regional regulations.
Then insert the power and
communication cables through the
holes from outside of the pack.
* Arrange the internal cable as
required to avoid blocking the holes
for external cables.
application.
* Refer to Section 3.3 Cable
Connections.
communication cables separately
using cable ties.
with M5 PH bolt 6ea.
* Hold the handle and turn it
clockwise.
* Make sure the Front Cover is
closed.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blgresu10hp

Table of Contents