Precor 9.33 Manual page 30

Hide thumbs Also See for 9.33:
Table of Contents

Advertisement

9.33, 9.35 240V Treadmill
10. Connect an AC voltmeter between terminals 4 & 5 of the OUTPUT connector on the power
control module. See Diagrams 5.3 and 5.4. Set the treadmill's on/off switch in the "on"
position. Press the QUICK START key. If the power control module is supplying output, you
will momentarily read approximately 55 Vac.
11. Repeat the procedure in step 4 between terminals 4 & 6 of the OUTPUT connector on the
power control module.
12. Repeat the procedure in step 4 between terminals 5 & 6 of the OUTPUT connector on the
power control module.
13. If one or more of voltage readings in steps 4 through 6 are not present, replace the power
control module. If the voltage readings in steps 10 through 12 are present, skip to step 8
Page 30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9.35

Table of Contents