Checking The Fins Communications; Checking The Connection Status; Checking The Received Data - Omron NSJ Series Connection Manual

Ethernet fins, safety controller, 5.7/8.4/10.4/12.1 inches
Hide thumbs Also See for NSJ Series:
Table of Contents

Advertisement

6.4. Checking the Ethernet FINS Communications
Confirm the Ethernet FINS commands are operating normally.
6.4.1.

Checking the Connection Status

Check the connection status of Ethernet FINS.
1
Confirm that COMM is lit yellow
and there no ERR light on the
G9SP CIF40 Ethernet Option
Board.
2
Confirm LED indicators on
EIP21.
MS: Lit Green
NS: Flashing Green
100M: Lit Yellow
10M: Lit Yellow
6.4.2.

Checking the Received Data

Confirm the correct data is sent and received.
1
Go to Memory in
CX-Programmer.
*Flashing
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

G9sp seriesG9sp-n10sG9sp-n20sG9sp-n10d82611-0010

Table of Contents