Installing The Batteries And 8. Checklist For The Installation - Huawei APM30H Installation Manual

Hide thumbs Also See for APM30H:
Table of Contents

Advertisement

7 Installing the Batteries an
a
Installing the Batteries
Before installing the batteries, set the battery MCB labeled B
disconnect the equipment from the battery. Finish the installati
BAT to ON.
During the installation of the batteries, use insulated tools su
wrenches and screwdrivers, and do not reversely connect the
negative poles. Otherwise, the batteries may burn, and the ope
cause human injuries.
cause human injuries
b
Installing the Power Cables fo
Install the negative
cable.
Recover the
protecting hood.
Remove the
protecting hood.
nd their Cables
BAT to OFF to
on, set the
ch as
positive and
erations may
or the Batteries
Install the copper bar for
series connections.
Install the positive
cable.
Recover the
protecting hood.
2
7
Battery MCB labeled BAT
EPS
Push the baffle
plate upwards
until it is
contact with
the screws,
and then
tighten the
g
screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tmc11hIbbs2000dIbbs200t

Table of Contents