Download Print this page

Forest garden Overlap Apex Shed 6 X 4 Quick Start Manual

Advertisement

Quick Links

Overlap Apex Shed
6' x 4'
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This buildings is pressure treated to ensure longevity of all
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises. This will not need additional
treatment.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.
0333 7777 089
Technical Helpline:
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Not to Scale
Fixing Pack (OPA46FP)
This fixing pack is used for several products.
There may be additional fixings.
Hasp &
Staple
Flush Hinge
Qty 2
10mm Felt tacks
Qty 100
REQUIRED TOOLS :
(NOT SUPPLIED)
SHARP KNIFE
SCISSORS
POZI DRIVE
FLAT HEAD
TAPE MEASURE HAMMER
SCREWDRIVER
SCREWDRIVER
Important :
Assembly of this
shed requires a
Must Pre-drill for
minimum of two
each screw used.
adults.
OPA46 PARTS LIST
C
A
B
OPA4PE
OPA6PS
OPA4DE
PLAIN END
PLAIN SIDE
DOOR END
H
J
45281753PT
1753mm BATTEN QTY 1
N
PLASTIC GLAZING STRIP QTY 3
1 1
E
Place the panels on top of the floor. Make sure that all the panels are tight and flush before
fixing them to each other using 3x50mm screws.
Before fixing the panels to the floor using 50mm screws, take care and make sure that they are
all sitting flush. All of the screws should be positioned so that they screw into the bearers
underneath.
3x50mm screws for the plain and window sides.
2x50mm screws for the plain and door ends.
3
J
L
Place the corner strips so that they cover the joins
between the panels. Fix each in place using 3 x 30mm
screws
D
E
OPA6WS
BRDFL46
WINDOW PANEL
FLOOR
L
K
51120810PAII58PT
810mm BARGE BOARD QTY 4
O
84996
Top View
2
B
D
C
O
A
A
a
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
4
N
Using a scissors carefully cut
one of the plastic strips to
559mm.
F
G
H
SDRPT
17917658
PCWIN1
DOOR
ROOF SHEET
GLAZING
QTY 2
QTY 1
M
44161570PT
1570mm C/STRIP QTY 4
20121695PPT
20 x1695mm STRIP QTY 1
A
F
b
Place the hinge against the inside of the door frame and
position the large section of the hinge so that it is flush
with the inside of the framing as shown. Fix with 25mm
screws.
Open the hinge and fix the smaller section to the door
framing. Again make sure that the hinge is flush and that
the holes are positioned so that the 25mm screws locate
correctly into the batten.
Place the window from the outside so that the lip sits on
the bottom board as shown.
Place the plastic strips around the window so that one
side butts up against the cladding.
Fix the strips and the window in place using 2 x security
screws for each strip and one for the top of the window.
Attention:
Take care when placing
the screws. These can
not be backed out.
I
FIN20010512PT
Finial
QTY 1
85052 QTY 1
37281791PT
1791mm BATTEN QTY 2
H
Lip
Board
Issue 0115

Advertisement

loading
Need help?

Need help?

Do you have a question about the Overlap Apex Shed 6 X 4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Forest garden Overlap Apex Shed 6 X 4

  • Page 1 Overlap Apex Shed OPA46 PARTS LIST FIN20010512PT 6' x 4' Finial QTY 1 IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ CAREFULLY This buildings is pressure treated to ensure longevity of all timber components and to protect against rot. This may leave OPA4PE OPA6PS OPA6WS...
  • Page 2 Sand off any rough/sharp edges. Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn. Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB...