Overlap Pent Wall Shed
6' x 3''
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pressure treated to ensure longevity of all
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises. This will not need additional
treatment.
- This product must be built on a solid level base.
- This product must be built on a solid level base.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
- The roof of this building is not a load bearing structure.
0333 7777 089
Technical Helpline:
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Not to Scale
Fixing Pack (OPW63FP)
This fixing pack is used for several products.
There may be additional fixings.
10mm Felt tacks
Qty 60
Flush Hinge
Hasp &
Qty 2
Staple
L Bracket
Qty 2
REQUIRED TOOLS :
(NOT SUPPLIED)
SHARP KNIFE
SPIRIT LEVEL
POZI DRIVE
HAMMER
SCREWDRIVER
TAPE MEASURE
Important :
Assembly of this
shed requires a
Must Pre-drill for
minimum of two
each screw used.
adults.
OPP63 PARTS LIST
C
A
B
OPW63PP
OPW63TP
OPW3DP
PLAIN PANEL
TALL PLAIN PANEL
DOOR END
QTY 3
J
H
I
44161944PTR
1944mm STRIP QTY 3
M
N
37281784PT
1784mm BATTEN QTY 2
1 1
A B
A C
A B
A D
Place the panels on top of the floor. Make sure that all of the panels are tight and flush
before fixing them to each other using 3x50mm screws.
Make sure that the panels are sitting flush before fixing to the floor using 2 x 50mm
screws for each panel. Make sure that all of the screws are positioned so that they screw
into the bearers underneath.
3
A G
Place the two apex sections on top of the structure as shown, making sure again that everything is flush and lined
up correctly before fixing each to the top of the panel and 670mm batten using 2 x 50mm screws. Using another
50mm screw secure the side of each apex section to the back panel.
D
E
BRDFL36
FLOOR
QTY 2
K
44161690PTR
1690mm STRIP QTY 3
673mm BATTEN QTY 1
O
59121100PPT
1100mm STRIP QTY 2
673mm BATTEN QTY 1
2
Fix the 28x28x670mm batten to the floor in between the back panel and the door panel. Make sure that it is flush with th front and
secure it in place using 2x50mm screws making sure that the screws are in lien with the floor bearers underneath.
Place the 1629mm batten on top of the batten you have just fixed and tight against the door panels framework as shown. Fix this in
place using 3x50mm screws.
Fix an L bracket at each end of both the 45x28x670mm batten using 2 x 25mm screws. Place the batten so that it is in line with the top
of the door front and flush with the framing. Secure this in place fixing the other half of the L' brackets. again using 25mm screws.
4
A H
Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3 x 30mm screws
F
G
SDRPT
178411008
DOOR
ROOF SHEET
QTY 1
L
45280673PT
28281629PT
1629mm BATTEN QTY 1
28280673PT
A L
A I
J
A J
A J
OW63LHA
LEFT SIDE APEX
H
OW63RHA
RIGHT SIDE APEX
85052 Qty 1
A K
A O
A I
A I
Issue 0115