Start/End Of Season Operations - Russell Hobbs RHPAC11001 Manual

11000btu 220-240v ac 50hz
Table of Contents

Advertisement

START/END OF SEASON OPERATIONS

Start of season checks
Make sure the power cable and plug are undamaged and the
earth system is efficient.
Follow the installation instructions within this manual precisely.
End of season operations
To empty the internal circuit completely of water, remove the
cap (Fig 32) and run all the water off into a pan.
When all the water has been drained, firmly put the cap back in
place. Clean the filter and dry thoroughly before putting it back
into the appliance.
Limit conditions
Cooling Mode
Temperature of room: 18-35°C (64-95°F)
Humidity of room: 30%-90%RH.
Heating Mode
Temperature of room: 10-25°C (50-77°F).
Humidity of room: 30%-90%RH.
RHPAC11001
v2.5
25

Advertisement

Table of Contents
loading

Table of Contents