Installation and setting
This unit is provided with a 110 V hospital grade plug or a 230 V European plug. If the unit
will be operated with a different plug, the plug can be exchanged for a local standard
grounding/earthing plug. For USA and Canada an UL/CSA approved mains cable and
plug is installed.
If the operating voltage is changed from 110 V to 230 V or vice versa, the mains fuses U9
and U10 must be exchanged:
100 V - 130 V = 15 A
200 V - 240 V = 10 A
Only use approved types of fuses, see Spare part list.
U
DHHS checks
S
A
The following measurements must be done according to "Maintenance Instructions
including DHHS requirements".
- mAs accuracy
- Reproducibilty
Labels
See Instructions for Use for adequate labeling.
Charging of batteries
Connect the power supply plug and switch the main switch to position "C" (battery charg-
ing). The batteries will now be charged automatically.
•
Check the battery indicator for full.
w
NOTE
Formation status for capacitors
Initialization and capacitor formation selftest
•
Switch the main switch to position "M" (mains power).
w
NOTICE
Siemens-Elema AB
Solna, Sweden
If not, charge the batteries.
Battery charging time from completely empty to full is 12 hours.
The MOBILETT runs a formation selftest during startup.
If the formation status is OK, the "Ready" light indicator lights up
in approximately 2 minutes. Continue with chapter "Function
check".
If error message "CAL 19" or "Err 17" appear on the display, see
chapter "Capacitor formation".
SPR8-220.033.03
Rev. 02
10.02
Page 3 of 12
MOBILETT Plus HP
SPS-UD
2 - 3
2
2
2
2
2