Kraus KHU100-26 Installation Manual page 45

Handmade stainless steel undermount kitchen sink
Hide thumbs Also See for KHU100-26:
Table of Contents

Advertisement

Step 7. Flushing and checking for leaks /
Étape 7. Vidange et vérification des fuites
10
Pull the hose assembly out of the spout
and remove the spray head by
unscrewing it from the hose in a
counterclockwise direction. Be sure to
hold the end of the hose down into the
sink and turn the faucet on to the warm
position where it mixes hot and cold
water. Flush the water lines for one
minute. This flushes away any debris
that could cause damage to internal
parts. Check for leaks. Re-tighten any
connections if necessary, but do not
overtighten. Reinstall the spray head by
hand tightening it back onto the spray
hose. After installation is completed,
turn on the hot and cold water supplies.
Check for leaks.
Retirer l'ensemble du tuyau du bec et
retirer la tête de pulvérisation en la
dévissant du tuyau dans le sens inverse
des aiguilles d'une montre. Veiller à
maintenir l'extrémité du tuyau dans
l'évier et à ouvrir le robinet en position
tiède où l'eau chaude et l'eau froide se
mélangent. Vider les conduites d'eau
pendant une minute. Cela permet
d'évacuer les débris qui pourraient
endommager les parties internes.
Vérifier s'il y a des fuites. Resserrer les
raccords si nécessaire, sans trop serrer.
Réinstaller la tête de pulvérisation en la
serrant à la main sur le tuyau
de pulvérisation. Une fois l'installation
terminée, ouvrir l'approvisionnement en
eau chaude et froide. Vérifier s'il y a des
fuites.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents