2
SETUP
2.1
Unpacking and setting up the vehicle
–
Remove the box and the plastic packaging.
Info
To avoid damaging the motorcycle during the setup, leave the protective
film on the vehicle until you have finished.
–
Check the vehicle for transport damage.
–
Unpack the separate enclosure and check its contents on the basis of the enclosure
list.
201922-10
–
Remove the controls from the transport holder. Remove the screws and handlebar
clamps. Remove the transport holder.
201923-10
–
Remove screw M8 from the right hand guard.
100318-10
–
Position the controls on the right half of the handlebar.
Info
The routing of the cables can be seen in the figure.
100306-10
–
Position the handlebar.
Marking 1 on the scale on the handlebar should be situated in the middle of
the handlebar clamp.
–
Position the handlebar clamps. Mount the four screws and tighten evenly.
Guideline
Screw, handlebar clamp
100305-10
–
Position the controls on the left half of the handlebar. Mount the screws.
600645-01
M8
20 Nm
(14.8 lbf ft)
3