HP-6 Recessed Flush Diffuser Tech Zone 6" T-Bar
Joiner/Ender
Installation Instructions
Step 5
Starter
Joiner/Ender
Slowly swing down backplate.
CAUTION: Do not twist the backplate when swinging down – it will come
out of the support extrusion.
Note that the screws shown are the pivot points, and the backplate can be slid
a few inches either way for ease of access to the driver space.
Step 8
Joiner/Ender
Secure to Structure
(by others)
Secure luminaire to T-Bar with #6-20 x 1/2" self drilling sheet metal screws (provided).
Note: All power connections to be installed to local/national codes
by a Certified Electrician.
Step 6
Pivot Point
IMPORTANT STEP:
(provided). When installed correctly these brackets will pull luminaires together to make a tight joint.
CAUTION: Do not over-tighten.
Step 9
T-Bar Bracket
#6-20 x 1/2" Self Drilling
Screws (provided)
Replace backplates by holding them in their original position and pushing the clips back in. Make sure wire connections are
not pinched. (If a 1ft. backplate assembly is near joint, reconnect feed harness to LED board.) Replace diffuser and turn power
on to luminaire. NOTE: If part of a longer run, diffuser will be reinstalled back into original luminaire section as lengths vary.
Finelite, Inc. • 30500 Whipple Road • Union City, CA 94587-1530 • (510) 441-1100 • Fax: (510) 441-1510 • www.finelite.com
IMPORTANT STEP
Joint Sleeves
#10-32 x 5/8" Screws (2)
(provided)
Yoke Brackets (2)
(provided)
Secure joint with two yoke brackets (provided) using two #10-32 x 5/8" screws
Starter
Backplate Clips
Diffusers
Step 7
Plug-Together Wiring
Connect plug-together wiring connections.
Joiner/Ender
2
Need help?
Do you have a question about the HP-6 Recessed Flush Diffuser Tech Zone 6" T-Bar and is the answer not in the manual?