Siemens SIMOTICS FD 1LH1 Operating Instructions & Installation Instructions page 6

Induction motor
Hide thumbs Also See for SIMOTICS FD 1LH1:
Table of Contents

Advertisement

Table of contents
4.11
Noise emissions.....................................................................................................................35
4.12
Rotational speed limit values.................................................................................................35
4.13
Voltage and frequency fluctuations during line operation......................................................35
4.14
Phase synchronization during supply system switching........................................................36
4.15
System-inherent frequencies.................................................................................................36
4.16
4.17
Transport and storage............................................................................................................37
4.17.1
Checking the delivery.............................................................................................................37
4.17.2
Requirements for safe lifting and transporting.......................................................................38
4.17.3
Securing the rotor...................................................................................................................39
4.17.4
Transporting the machine set.................................................................................................40
4.17.5
Storage...................................................................................................................................40
4.17.6
Protecting the cooling water circuit during storage................................................................43
4.17.7
Protection against corrosion...................................................................................................44
4.18
Converter operation...............................................................................................................44
4.18.1
Supply line configuration........................................................................................................44
4.18.2
Reducing bearing currents.....................................................................................................45
4.18.3
Insulated bearings when operating the converter..................................................................46
5
Assembly....................................................................................................................................................49
5.1
Preparations for installation....................................................................................................49
5.1.1
Requirements for installation..................................................................................................49
5.1.2
Insulation resistance and polarization index..........................................................................50
5.1.3
Testing the insulation resistance and polarization index........................................................50
5.1.4
Prepare the mating faces (IM B3)..........................................................................................53
5.1.5
Prepare the mating face for a flange connection...................................................................53
5.1.6
Prepare the mating face for wall mounting ............................................................................53
5.2
Lift the machine to where it will be installed, and position it...................................................54
5.2.1
Preconditions for correct alignment and secure attachment .................................................54
5.2.2
Checking the load handling attachments...............................................................................54
5.2.3
Removing the rotor shipping brace........................................................................................54
5.2.4
5.2.5
Removing anti-corrosion protection.......................................................................................55
5.2.6
Mounting the output elements................................................................................................56
5.2.7
Requirements for safe lifting and transporting.......................................................................58
5.2.8
Putting the machine down......................................................................................................60
5.2.9
Draining condensation...........................................................................................................60
5.2.10
Roughly aligning the machine................................................................................................62
5.3
Installing the machine............................................................................................................62
5.3.1
Safety instructions for installation...........................................................................................62
5.3.2
Selecting fixing screws...........................................................................................................63
5.3.3
Preconditions for smooth, vibration-free operation................................................................63
5.3.4
5.3.5
5.3.6
Fastening the support base (IM B5).......................................................................................66
5.3.7
5.3.8
Axial and radial forces............................................................................................................67
6
SIMOTICS FD 1LH1
Operating Instructions 04/2016

Advertisement

Table of Contents
loading

Table of Contents