Panasonic CS-Z25UB4EAW Service Manual page 44

Hide thumbs Also See for CS-Z25UB4EAW:
Table of Contents

Advertisement

3
Fit the decorative panel and ceiling wall together and confirm no gap in between. Readjust indoor unit height,
if there is a gap between ceiling wall and decorative panel.
Good example
4
Open the indoor control box cover. (2 pcs)
5
Insert firmly the connector of cosmetic louver
to indoor pcb CN-STM1, CN-STM2 and
CN-DISP.
Be caution not to clamp the cord in between
control board and control board cover.
6
After complete, install back removed part
follow opposite procedure.
Be sure to hook the air inlet grill string,
to prevent grill from falling and causing
Warning
injury from it.
12.1.9
Connect the Piping
12.1.9.1
Connecting The Piping to Indoor
For connection joint of all model (except R32 model)
Please make flare after inserting flare nut (locate at joint
portion of tube assembly) onto the copper pipe. (In case
of using long piping)
Connect the piping
Align the center of piping and sufficiently tighten the
flare nut with fingers.
Further tighten the flare nut with torque wrench in
specified torque as stated in the table.
Spanner or
Wrench
12.1.9.2
Connecting The Piping to Outdoor
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge. Make flare after inserting the
flare nut (locate at valve) onto the copper pipe. Align center of piping to valve and then tighten with torque wrench to
the specified torque as stated in the table.
Air conditioner
unit
Air
Decorative
panel
Fit the insulator (this part) and
be careful for cool air leakage.
Hang the
string
Air inlet grille
For connection joint of R32 models
Torque wrench
Bad example
Cool air leakage
(no good)
Ceiling
Catcher
Decide the length.
Cut and remove the tube connectors at indoor copper pipings (both gas and liquid
piping) by using pipe cutter. Remove burrs from cut edge.
Use pipe expander to expand the end of long piping.
Align the center of piping and braze the piping joints.
(40~50mm)
Indoor copper pipe
Tube connector
1. Cut and Remove2.
Braze the piping joints carefully so that the indoor unit is not damaged by brazing flame
If necessary, cover with wet clothes to prevent parts unintentionally overburnt.
44
Air conditioner
unit
Air
Ceiling
Decorative
panel
CN-STM2
CN-STM1
CN-DISP
Clamp lead
wire with band
here
Catcher
Brazing point
3. Braze both pipe
2. Expand long pipe3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents